layher central west

St Peters & Pauls Cathedral, Goulburn

Built from 1871 - 1890, St Peter’s and Paul’s Cathedral is a State Heritage listed blue stone building which has been undergoing major renovations. Restoration works have been taking place both internally and externally including replacement of the fleche, rejuvenation of the stone, structural securing and underpinning and replacement of the slate roof.

Our team have done a fantastic job addressing each of the design challenges on this project, large amounts of engineering were required when working on a building of this age. This project has tested the skills of our talented team, using multiple scaffold systems and advanced scaffolding techniques that have resulted in a quality product for a happy client. This marks the culmination of 18 months of planning, design and hard work from the Dunbar Scaffold team, we have enjoyed being apart of this project and look forward to seeing this beautiful building brought back to life.

Game On 2021

After the cancellation of major events last year, we were keen to get in and set up for the Panthers Vs Manly NRL game to be hosted in Bathurst this weekend.

With stunning autumn weather onside, we finished the build in record time. The main deck is now ready and waiting to receive its VIP guests this Saturday from 3pm!

We are so proud to be part of the huge crew of professionals that come together to host such an event here in Bathurst.

Best of luck to all the Players!

Bathurst NRL - 2019

Corporate+Deck+-+NRL+Bathurst+2019

It was a record number in attendance at Carrington Park this year for the Bathurst round of the NRL.
Dunbar Scaffold Hire were proud to provide the Corporate deck and media platforms for the event for the third consecutive year.

With all of the finishing touches completed on the pack down last week, we will see you next year!

That's a Wrap for 2018!

As another busy year comes to an end, it is a time of reflection and gratitude…

On reflection, we have had the opportunity to work on a diverse range of projects, a small sample of what was achieved in 2018 is shown below.

And it is with gratitude that we thank all the wonderful clients, suppliers and contractors that we have had the pleasure of working with this year. We are looking forward to all the exciting projects in the pipeline for 2019.

And a huge thanks to all of our valued employees for their efforts and contribution throughout the year.

West Wylong Tank

Water Reservoir

Full perimeter scaffold for blast and paint works to be completed.

Goulburn Uniting Church

Goulburn Uniting Church

The Kedar Roof structure being craned into place on this multiphase project was a significant milestone. The weather proof membrane enabled interior works to proceed after the spire had been demolished.

More to come on this project in 2019.

Bloomfield-Medical-Centre

Bloomfield Medical Centre

The BMC project team have been working hard for the last few months bringing this structure to life. This project is on track for completion in the new year.

Read more in the Central Western Daily;
https://www.centralwesterndaily.com.au/story/5797232/tower-taking-shape-bloomfield-medical-centre-on-target-to-open-within-a-year/

Menindee Rail Bridge

Menindee Rail Bridge

Hung scaffold for bridge maintenance.

Newington College

Newington College

This 34m high cantilevered scaffold will provide safe and reliable access for restoration works on the spire of the Founders Building at Newington College this summer.

This project was completed last week, a wonderful achievement to finish out the working year.

Merry Christmas and Happy New Year
- From all the Team at Dunbar Scaffold Hire